Design & Engineering In Schools
School Design Project
With years of experience, Homify will be designed by our team exclusively for your school that properly satisfy your demands.
Moving furniture and storage is mainly used in the project to increase the amount of space available for the lesson and various activities.
In IOT interior designs of schools, Homify can offer codiable RGB light. With their coding, students can alter the color of the light. Additionally, with a unique teacher table design, it can be used with Lego EV3, Micro:Bit.
Sure. We also provide various interior design and support services. For instance, the library, the gym room, and AV system in the hall.
Services and preparation
We have a professional design and construction team on staff to ensure completion on schedule. Additionally, we will confirm the construction-related items beforehand, making the official construction period of four weeks.
Following an assessment, we will schedule a site visit to take measurements and go over any unique needs with your team leaders.
We have the knowledge and expertise to offer advice to teachers while saving you time.
Engineering of solar panels
Calculating revenue and power generation
less solar light on cloudy days means that electricity use will be less than half of normal.
The solar panel is 2M x 1M. Our staff will assess the environment to provide you the best strategy possible.
Types of Feed-in Tariff rates
RE system capacity | ≤ 10kW | >10千瓦 - ≤200千瓦 | >200千瓦 - ≤1兆瓦 |
FiT rate (per kWh) | HK$4 | HK$3 | HK$2.5 |
RE system capacity | ||
≤ 10kW | 10千瓦 - ≤200千瓦 | 200千瓦 - ≤1兆瓦 |
FiT rate (per kWh) | ||
HK$4 | HK$3 | HK$2.5 |
As an example, a 10kW RE system may provide 1000 watts of power in a year with 1000 hours of daylight.You can obtain HK$40,000 based on the FiT rate of HK$4.
The HK Electric/CLP bill will include "customer income." The profit will be deducted from your utilized electric bill, and the remaining profit will be sent to you through check. Customers may check capacity on the HK Electric/CLP website/app.
Following the HK Electric/CLP Feed-in Tariff Scheme, customers can enjoy the benefits listed below.
1. By including a power storage system, you may become self-sufficient in terms of electricity
2. Saving more money
3. Reduce room temperature by 2-3 degrees.
*Knowing that HK Electric and CLP are looking towards extending the Feed-in Tariff Scheme to 20 years.
Support And Service
The RE system rate will be impacted by too many leaves, dust, or bird droppings, therefore it requires frequent maintenance. Additionally, Homify offers excellent care services.Please get in touch with us if you have any questions or you want additional details.
我們的太陽能發電板保養期為最少10年,且保證15年後系統轉換效率仍達80%以上。
Calculating revenue and power generation
The solar panel system will not produce any noise. The electromagnetic waves produced by a 20kW solar panel are comparable to those of a computer.As a result, there is no need to be concerned about the effects on health.
Solar energy has almost no extraction byproducts. Furthermore, compared to coal-fired power, there is less than 90% of air pollution product.
It can withstand hurricanes since aluminum/steel footholds are utilized and tested by structural engineers.
It takes about a month from contract signing to completion of solar panel installation.
It depended on a number of environmental factors, such as the orientation of the structure. To provide you the best possible plan, our experts will assess the surrounding circumstances and give you the best method.
When the power goes out, a power storsage equiment must be set up to offer power backup.
you have to fulfil all of the following criteria
First., register as a user with HK Electric and CLP
Second, install a solar power system at your registered address with a total power generating capacity of no more than 1 MW.
Third, Your solar power generating system has been successfully linked to the CLP/HK Electric grid, and CLP/HK Electric does not need to enhance grid capacity or carry out grid strengthening works.
Application Procedures
1. Submit application form and required documents
2.After the system has undergone technical evaluation, installation, and testing, CLP/HK Electric will install smart meters.
3.The installation is complete and successfully connected to the CLP/HK Electric grid